Grand Bahama Shipyard Dock Joining
Freeport | Bahamas
Resolve Marine partnered with Grand Bahama Shipyard Limited (GBSL) to support the assembly of Lucayan, the shipyard's new mega dry dock. The project required specialized marine engineering expertise and precise execution to transform four separate dry dock sections into a single operational structure. Due to its immense size, Lucayan was transported to Freeport, Bahamas, in four individual sections aboard heavy-lift vessels. Assembling the dock presented a complex marine construction challenge that demanded careful coordination, precise positioning and continuous management of numerous operational variables.
The dock joining involved working within narrow tolerances while executing intricate ballast operations, maneuvering massive floating structures, and aligning the sections for permanent connection. Success depended on maintaining control throughout every stage of the assembly process while adapting to evolving project requirements. Resolve Marine provided critical engineering and operational support throughout the assembly effort, working closely alongside GBSL to develop and execute a safe and efficient installation strategy.
The project’s key components included controlled ballasting operations to position and stabilize the dock sections, float-off operations for the smaller dock sections, precise maneuvering utilizing temporary hydraulic winches and alignment and positioning of all four sections for final connection.
The successful assembly of Lucayan marked a major milestone for Grand Bahama Shipyard and the region's maritime industry. Resolve Marine successfully delivered a critical asset that will enhance ship repair and maintenance capabilities in the Caribbean for years to come.